ServicesInstallation
The full cycle: design, supply from Italy and install supervision
We've described how the engineering support is structured — from joints and BIM to factory supply and control of the first course on site.
Riverclack is not only the sheet and the lock but engineering support across every stage. Terra-Zenith takes on the full cycle from a single point of accountability.
From drawing to handover
Joint detailing and BIM, load calculations to SP 20.13330, profile supply from the factory in Italy, crew training and engineering supervision. The first course sets the geometry of the whole roof — which is why controlling the start is critical.